Sineng Electric and CATL cooperate to support Huadian Jinchuan Gasdu photovoltaic storage project

2024-12-26 20:12
 0
Sineng Electric and CATL have joined hands to successfully help Huadian Jinchuan Gasdu photovoltaic storage 20MW/40MWh project to be connected to the grid smoothly. This cooperation not only marks a new peak in the cooperation between the two parties, but also sets a new benchmark for energy storage solutions in high-altitude areas. The project is located in Gasdu, Jinchuan County, Aba Prefecture, Sichuan Province, at an altitude of about 4,600 meters, facing extreme climatic conditions, including low temperature and high ultraviolet intensity. Sineng Electric provided 8 2.22MW converters and 1 2.56MW converters and 18 1.6MW energy storage converters. These devices have the characteristics of high efficiency, high protection level and high reliability, and can adapt to the complex environment of high altitude areas.