Large-scale vehicle-network interaction verification of new energy vehicles has been successful

2025-01-10 20:52
 67
Recently, at the largest vehicle-grid interaction verification base in China in Wuxi, Jiangsu, 59 new energy vehicles from 10 different brands discharged electricity to the grid in a concentrated manner. The discharge lasted 1.5 hours, and the maximum discharge power reached 2,100 kilowatts. This scene demonstrated the ability of new energy vehicles to discharge electricity to the grid in reverse as "power banks".