Analysis of Fulin Precision's production capacity

2025-01-15 11:10
 62
In 2023, Fulin Precision's new energy and hybrid parts production capacity will reach 9.26 million pieces/year, with a capacity utilization rate of 48.3%. The thermal management system and parts production capacity will reach 5.4 million pieces/year, with a capacity utilization rate of only 25.7%. The lithium battery positive electrode material production capacity will be 140,000 tons/year, with sales of 45,200 tons, a year-on-year increase of 2%, and a capacity utilization of 30.1%.